Studies were conducted by University of Washington engineers, who suggested tie-down cables to help strengthen the bridge. Hydraulic buffers were added in an attempt to help control stress to the towers. (Courtesy Peninsula Historical Society.)

Lifting cranes were installed on the wire suspension cables, and prefabricated deck steel delivered by Foss barges was positioned into place. Steel workers began at each tower and worked towards the middle, riveting them into place. The solid 8-foot-high sections offered resistance to the wind and added to Galloping Gertie’s problems. (Courtesy Peninsula Historical Society.)



Download



Copyright Disclaimer:
This site does not store any files on its server. We only index and link to content provided by other sites. Please contact the content providers to delete copyright contents if any and email us, we'll remove relevant links or contents immediately.